Changing "Subcontruction" to "Other (Sub. debris and etc.)"
Overview
We are going to change the “Subcontruction” section to “Others (Sub, debris and etc)” in the task detail modal and summary page.
- Combine Finish Material and Other Material into one section and call it Materials
- Subcontruction will be "Others (Sub, debris and etc)”
Before
After
Introducing the new "Adjustment" section in the summary.
Overview
“Add to labor” checkboxes have been removed from overhead and profit. The users will no longer adjust labor from the overhead and profit. Instead, we are introducing a new section called Adjustments in the “Overhead, profit…” dialog. The user can now adjust the labor and materials separately. This will allow the user to independently adjust the items even after presenting to their clients.
Before
After
Adjusting overhead & profit example:
- If the user doesn't want to display overhead, profit, or both, will use the adjustment section.
- Allow users to freeze adjustment distribution: Users not only have the flexibility to add adjustments across all items but also are able to freeze the adjustments while making changes to some specific items.
Improve the "Overview" dialog modal in the estimate
Overview
With the new update the total, material, and labor columns will not be display in the overview section. The overview section will have only the “Amount” column instead, we have introduced the cost breakdown reference section and will show labor, and material totals separately in this new model.
NOTE: After the new Estimator enhancement migration, users need to
manually go into your estimates to check the information you need to be
displayed at the cost breakdown reference section.
-
On the overview page (first page), we will display only the “total” column. The column name will appear as “Amount”.
-
Introduce cost breakdown references. Which is;
-
Labor
-
Materials (Pro)
-
Materials (Budget)
-
Material (Pro & Budget)
-
Others
-
Materials & Others
-
-
The user will be allowed to choose max 4 columns.
Before
After
Improve the "Item Cost Header and Detail" dialog modal.
Overview
The finish material and other materials will be displayed together and grouped by their furnish types.
Before
After
Adding "Labor Unit Cost" to task detail modal
Overview
We are bringing back a feature based on the feedback that we got from our users.
The users will have 2 options to calculate labor.
1. Use labor unit cost and task size to calculate labor.
2. Use labor hours and labor rates to calculate it.
Before
After
Adding multiple clients to the estimate
Overview
If the estimate has multiple clients, the “Client” text repeating on the estimate proposal. Second “Client” text will be removed from the summary and the design will be improved.
Before
After
Changing the "alarm icon" location to prevent calculation errors
Overview
When there is a calculation error on a task, the alarm icon will warn the user. The alarm icon was located in the task & material section after the user clicks the edit button. This update will improve the user experience and will save time to address the error quickly.
After
Allowing users to display the company logo and name
Overview
The user now can display the company logo and the business name by changing the settings from "Brand settings" and change the display type to "Display company logo and name".
Changing the "Layout" menu to "View" on summary
The menu name will be changed to "view".
Before
After
Update to the explanation of Client/Budget/Pro
Overview
Client
The client furnishes materials. No material cost included in the estimate.
Pro
Pro furnishes materials. Material cost is included in the estimate, but not displayed.
Budget
Material cost set as allowance. Material cost is included and displayed in the estimate.
If you have any feedback about the new changes or any suggestions, please send an email to support@247pro.com.